Stations Gallery > KMVU Master Control and Rack Room Design and Implementation
The KMVU project consisted of building a temporary Master Control room, while creating a new rack room that would integrate new and existing gear for the permanent Master Control room. HVS, Inc. helped KMVU with wiring and configuration of the temporary Master Control room, in addition to installing the wiring for both the temporary and permanent Master Control rooms, and the rack room. This was a collaborative effort to develop a system design and implementation for a small market on a limited budget. HVS worked with KMVU on system design and implementation, with KMVU staff providing most of the installation work to allow the most benefit from the budget allocated.